Turnkey EV Charger Installation

Looking for a simple way to get EV charging set up? EVlution offers a hassle-free, turnkey solution for your EV charging needs. From businesses, organizations to multi-unit residences, our experts handle every step along the way to make planning and installing a breeze for your EV charging endeavours.

We're Here to Help

Our Turnkey Installation service simplifies the deployment of EV charging stations, with technical guidance and project execution from start to finish. Even if you're unsure of where to start or if you're unclear if your property has the right infrastructure to support EV charging, our team is here to help, make things easy, and get you started on your charging journey.

Site & Technical Assessment, Grant Funding Review, Permitting

Equipment Selection, Site Preparation, Professional Installation

Safety & Compliance Checks, Final Testing, Commissioning

Proven Process

0
1
2
3
4
01

Consultation, Site Assessment & Grants

We start by understanding your EV charging needs and discussing the best charger options for your location. If you're eligible, we'll help recommend suitable government grants and assist in selecting the optimal installation spot.

02

Electrical & Technical Review

Our experts assess your existing infrastructure's capacity, suggesting upgrades if necessary. Additionally, we offer sustainable energy options that involve setting up solar panels connected to your EV charging station.

03

Equipment, Procurement & Installation

Once everything is set, we order all the required electrical equipment, including the EV charger. Our skilled technicians handle all groundwork, trenching, and internet connectivity, delivering a fully functional EV charging station.

04

Compliance & Commissioning

Once installation is complete, the system undergoes a series of checks to ensure that everything is operating safely and in compliance. The final step is testing the entire system to ensure it operates as expected under real conditions.

Why EVlution?

End-to-End Convenience

We handle every aspect of the installation process, from consultation to final setup, so your station is up and running in no time, ready to power.

Expert Guidance

Our expert team provides tailored recommendations, helping you choose the perfect EV charger, while also seeking available grants to save costs.

Seamless Integration

With an in-depth electrical analysis, we ensure your existing infrastructure is compatible, minimizing any potential disruptions during installation.

Ongoing Support

If needed, we provide thorough post-installation support and maintenance services to ensure that the equipment remains in optimal working condition.

Complete End-to-End EV Charging Installation

Installing commercial EV chargers involves more than just mounting hardware. From power capacity planning and city permits to trenching and utility approvals, EVlution manages your entire project under one roof across British Columbia and Alberta.

Electrical Engineering & Power Audits

We assess your building's main breaker panels, transformers, and meter rooms. Our engineers design smart load-sharing layouts that get the most out of your current electrical capacity, avoiding unnecessary service upgrades.

Utility Coordination & Permits Handled

We manage all municipal building permits, electrical safety inspections, and coordination with local Canadian power utilities (including BC Hydro, FortisBC, EPCOR, and ENMAX) so you never deal with red tape.

Civil Construction & Safe Wiring

Our licensed electricians and civil crews handle parking lot trenching, concrete mounting pads, directional boring, protective bollards, and weather-sealed conduit runs built tough for Canadian winters.

Network Activation & Testing

Before handover, every charger is thoroughly tested for safety and connected to the EVlution cloud network. We configure driver payment rates, access cards, and mobile app features for a smooth launch.


Why Choose Turnkey Installation?

Comparing an all-in-one EV installation partner with hiring multiple separate contractors.

Project Requirement Hiring Multiple Separate Contractors EVlution Turnkey Installation
Single Point of Contact You manage separate electricians, civil contractors, and software reps One dedicated project manager handles every stage
Rebate & Grant Filing You prepare and submit government grant paperwork alone We identify and manage Canadian grants (NRCan, CleanBC) for you
Utility Interconnection You navigate utility applications (BC Hydro / EPCOR) We complete all utility engineering and connection filings
Software & Payments Setup You set up and configure third-party software yourself Turnkey activation of driver billing, RFID cards, and app payments
Warranty & Ongoing Care Separate warranties for hardware, labor, and software Unified 24/7 monitoring, warranty support, and fast on-site service

Our 5-Step Installation Process

How we take your property from an initial walkthrough to active charging stations.

Step 01

Site Assessment

We review your electrical room, panel capacity, and parking stall layout.

Step 02

Engineering & Rebates

We draft the electrical design and submit your provincial and federal grant files.

Step 03

Permits & Approvals

We obtain municipal permits and coordinate connection details with your local utility.

Step 04

Construction

Certified crews complete trenching, conduit runs, concrete bases, and charger mounting.

Step 05

Testing & Launch

We test every plug, connect stations to the cloud network, and train your team.


Frequently Asked Questions

How long does a typical commercial EV charger installation take?
Standard Level 2 commercial installations usually take 1 to 3 weeks from permit approval to commissioning. High-capacity DC fast charging systems requiring utility transformer upgrades typically take 6 to 12 weeks, depending on utility interconnection timelines.
Will our building need an expensive electrical service upgrade?
Not always. In many commercial properties and multi-family parkades, our smart load management systems share existing power across multiple chargers. This dynamically adjusts charging speeds based on building demand, often avoiding the need for costly utility transformer upgrades.
Do you handle municipal permits and electrical inspections?
Yes. EVlution manages all city permits, safety authority filings (such as Technical Safety BC), and final electrical inspections. We ensure full compliance with the Canadian Electrical Code (CEC) before any station goes live.
What Canadian rebates are available to offset installation costs?
Depending on your property type and location, you may qualify for Natural Resources Canada (NRCan ZEVIP) grants, CleanBC Go Electric rebates, or local municipal funding in Alberta. We identify all active programs and handle the grant paperwork for you.
What happens if a charger requires maintenance after installation?
All installations are backed by our Operations & Maintenance (O&M) packages. Our team monitors your stations 24/7 via cloud diagnostics to catch issues early and dispatches certified field technicians across British Columbia and Alberta for quick on-site repairs.

Ready for the Ease of a Turnkey EV Installation?

Connect with our experienced EV charging team to explore the best solutions for your project.